DRAGON FAIRY NHA TRANG PROJECT

Bored Piles:

Bored piles D1200mm, 12-22m depth, drilled into 2-3m rock.

Diaphragm Wall:

198m of D.W 600mm width, 8-21m depth.

Jet Grouting:

Jet grouting 143 of Bored pile D1200, 12-22m depth.

Office combined housing

Address: 87A, 89/9/11/13/15 HÀM NGHI, Ward NGUYỄN THÁI BÌNH DISTRICT 1.

20 pile D1000mm deep 40m

41m diaphragm wall 500 deep 40m, 92.8m diaphragm wall 500 deep 16m.

Hotel Liberty Central Đà Nẵng

Location: Võ Nguyên Giáp và Loseby, P.Phước Mỹ, Q.Sơn trà, Đà Nẵng.

Investor: Cty TNHH MTV Phạm Ngân Nhi.

Bored Piles:

– 44 bored piles D1000mm depth 48.1m ( drill into the stone 1m).
– 139 mortar pile D300mm depth 9m.
Diaphragm wall:
– 117m Diaphragm  800 depth 32.5m.

Center Commerce GMALL

Location: 240-242 Kha Vạn Cân, Hiệp Bình Chánh.Ward, Thủ Đức.District, HCM City.
–     Content job:
  •  396m Diaphragm wall 600 depth from 14m.
  •  191m Diaphragm wall 800 depth from 15m
  •  587m Top beams 600/800x1000mm.

HIYORI GARDEN TOWER Project

 

  • Location:  Lô 2-2A, Vo Van Kiet St., District Sơn Trà, Đà Nẵng
  • Investor: SUN FRONTIER VIỆT NAM
  • General contractor: DinhCo
  • Contractor: PHUCUONG CONSTRUCTION.

Bored Piles: 96 bored piles D1200mm, 59m depth.

06 bored piles D1000mm, 45m depth.

22 bored piles D600mm, 20-32m depth.

Diaphragm wall:

182.4m D.Wall with thick  600-800mm, depth from 20-22.5m.

 

SSG Basement

Location: Binh Thanh Dist, HCMC

Client: SSG Group

Consultant: South light Construction Consultancy

Scope of works: construction Foundation and 4  basements by Semi-Topdown method

Orchard Garden

Location: 128 Hong Ha St., Ward 9, Phu Nhuan District, HCMC.

Investor: NOVALAND GROUP.

Contractor: WADRILLCO.

Scope of work: Bored piles and Diaphragm walls.

  • 36 bored piles D1200mms, 36-55ms deep.
  • 83 bored piles D1000mms, 42-52ms deep.
  • Diaphragm walls: 260ms diaphragm wall W600mms, 1,800mms deep.
  • Testing methods: Koden test, Load test, Sonic test.

THE ONE

Location: Pham Ngu Lao Street, District 1, HCM City

Investor: BITEXCO GROUP.

Contractor: WADRILLCO.

Scope of work: test piles, mass piles, Barrette piles, and Diaphragm wall

  • Test piles: 02 bored piles D1.2ms-1.5ms, 52.5ms deep, 01 pile of 800mms x 2,800mms, 61ms deep
  • Mass piles: 13 bored piles D1,000mms, 52.5ms deep
  • Barrette piles: 275 Barrette piles of 700 x 2,800mms, 800 x 2,800mms, 1,000 x 2,800mms, 1,200 x 2,800mms, 57-84ms deep
  • Diaphragm wall: 460ms wall of 1,200mms thick, 49ms deep

ĐỨC LONG TOWER

Tên dự án: ĐỨC LONG TOWER
Địa chỉ: Thành phố Hồ Chí Minh
Chủ đầu tư: Xí Nghiệp ĐỨC LONG GIA LAI
Nhà thầu chính: CÔNG TY TNHH PHÚ CƯỜNG
Thi công: Thi công cọc khoan nhồi

  • 80 cọc đường kính D800mm, chiều dài 40m
  • 80 cọc đường kính D1200, chiều dài 40m

Thời gian thực hiện: hoàn thành 12/2006

CONTENTMENT PLAZA

Tên dự án: CONTENTMENT PLAZA
Địa chỉ: PHƯỜNG VĨNH PHÚ, THỊ XÃ THUẬN AN, TỈNH BÌNH DƯƠNG
Chủ đầu tư: CÔNG TY TNHH XD-DV-TM ĐẦU TƯ BDS TƯỜNG PHONG
Nhà thầu chính: CÔNG TY TNHH PHÚ CƯỜNG (WADRILLCO)
CÔNG VIỆC
Cọc thí nghiệm

  • 2 cọc đường kính 1,2m, sâu 60m
  • 1 cọc đường kính 1,0m, sâu 58m

Công tác thí nghiệm

  • Siêu âm d1200  30cọc , d1000 62 cọc , d800 6 cọc.
  • Thí nghiệm thử tĩnh, tải trọng thí nghiệm 1625 tấn/cọc d1200 , 1375 tấn/cọc d1000

Cọc đại trà

  • 82 cọc d1200, sâu 60m
  • 167 cọc d1000, sâu 58m
  • 25 cọc d800, sâu 40m

Thời gian thực hiện: từ tháng 04/2011